Type of plant:

Plate glass manufacture

Customer:

Euroglas Poland

Project site:

Ujazd (Poland)

Project description:

The energy management system is designed for:

  • Visualisation of medium-voltage, low-voltage switchgear systems and diesel generators
  • Remote control of the medium-voltage and low-voltage switches
  • Monitoring of energy supply limits
  • Connection of the emergency power diesel generators in the event of power failures
  • Automatic connection and disconnection of loads in emergency power supply
  • Alerting and signalling of failures
  • Depiction of trends

 

Technical highlights:

  • PCS7 V7
  • MFL and Siemens powerrate
  • AS 416-2
  • ET 200S
  • approx. 6000 I/O
  • Activation of approx.20 medium-voltage and 50 low-voltage motor circuit breakers