Project description: | - Replacement of former control systems
- Safety analysis
- Wear optimisation through speed regulation (adjustment of friction gear speed to train speed)
- Increase of capacity (through a secure block system and permanent adaptation of lift speed, it was possible to introduce an additional train and thus increase capacity by 50%).
Scope of services: - Consulting and solution design
- Hardware and software engineering
- Safety concept
- Manufacture of switchgear cabinets
- Electrical and pneumatic installations
- Brake monitoring system
- Commissioning
- Technical safety inspection (TÜV)
|