Type of plant:

Glue and hydrogen peroxide

Customer:

Arkema GmbH

Project site:

Leuna

Project description:

1995- Installation of the hydrogen peroxide facility: erection, supply of switchgear cabinets and field instrumentation

1998- Installation of glue loading facility: engineering, erection, supply of switchgear cabinets, automation technology, visualisation and PLC programming.

2000- Extension of glue plant: iFix, Opto Control.

2002- Intsallation of main control room: engineering, automation technology, visualisation.

2004- Renewal of hydrogen peroxide syphoning, engineering, supply of switchgear cabinets, visualisation

2005- Expansion of hydrogen peroxide syphoning, engineering, erection, automation technology, visualisation and PLC programming 

 

Technical highlights:

Main control room: 3 Stationen iFix, Simatic S7-400H


Leim: 2 iFix stations, 2 Opto Control systems, Simatic S7-400 and S7-300


Loading facility: 1 iFix station, Simatixc S5-135U, S7-300


Hydrogen peroxide: 1 Biboss station, Simatic S5-135UWasserstoffperoxid: 1 Station Biboss, Simatic S5-135U

 

Vinci