Type of plant:

Melkoya liquid natural gas plant

Customer:

Linde AG

Project site:

Höllriegelskreuth / Hammerfest

Project description:

Process control engineering basic engineering

  • Creation of loop diagrams using Intools for the Hammerfest project
  • Instrumentation layout for loop diagrams, cabling and circuitry with Intergraph Intools, compilation of documentation and capturing manufacturer data in the Intools database
  • Documentation contents:
    - Loop diagrams
    - Terminal diagrams
    - Cable lists

 

Reviewing PU documentation

  • Reviewing PU documentation after resubmission (3 packages totalling 900 pages)

 

Layout of field instrumentation

  • In-situ planning
  • Preparing data sheets
  • FATs according to supplier’s specifications
  • Updating and checking manufacturer’s documentation 
  • Rectifying technical problems and on-site questions from subcontractors relating to the documentation of the instrumentation layout and erection (P, T, L and valves)
  • Checking final documentation of field instrumentation suppliers
  • Checking operating instructions and product descriptions of fielfd instrumentation suppliers
  • FAT for field instrumentation suppliers (Europe, Norway)
  • Redllinings in as-built documentation for instrumentation
  • Application of the technical databases MS Access and Sigraph I&C
  • Reordering of missing equipment
  • On-site coordination with Aker Stord erection subcontractor


 
Interface coordination

  • Rectifying technical problems and on-site questions from subcontractors relating to the field instrumentation during mechanical completion and loop tests
  • Clarification of FAT defect lists/work packages/FEM punch tests for the SAS system  (ABB, HIMA) with contracting companies
  • Monitoring and alignment of cause and effect reactions and function block diagrams

 

Technical highlights:

Software:

  • Intools
  • MS Access
  • Sigraph MSR
Vinci