Type of plant:

Fuel depot control room concentration, old aroma plant etc.

Customer:

PCK Raffinerie GmbH

Project site:

Schwedt

Project description:

  • Complete E/I&C installation and startup
  • Replacement of the mechanical level measurement equipment by radar fill level measurement devices on over 50 tanks
  • Connection to new ENTIS tank level management and balancing system
  • Renewal of field cables
  • Renewal of the entire I/O level including lightning protection to the new control system (supply and erection of marshalling cabinets, coupling relay & equipment cabinets and energy distribution components)
  • Fibre-optic cable coupling between MD control panel and OK control panel 

Technical highlights:

 