Fuel depot control room concentration, old aroma plant etc.
Customer:
PCK Raffinerie GmbH
Project site:
Schwedt
Project description:
Complete E/I&C installation and startup
Replacement of the mechanical level measurement equipment by radar fill level measurement devices on over 50 tanks
Connection to new ENTIS tank level management and balancing system
Renewal of field cables
Renewal of the entire I/O level including lightning protection to the new control system (supply and erection of marshalling cabinets, coupling relay & equipment cabinets and energy distribution components)
Fibre-optic cable coupling between MD control panel and OK control panel