Type of plant: | Coal-fired power plant |
Customer: | ABB AG, Minden |
Project site: | Rotterdam, Maasvlakte |
Project description: | ABB was contracted by E.on to renew the control systems for the 2 power plant blocks including the related ancillary plants. A particular challenge were the short shutdown times during which the control systems were to be replaced. Actemium had only a 2-week shutdown period for each block in which to carry out the erection work. In these 2 weeks, approx. 80% of the work had to be completed. Thanks to the high level of motivation and qualification of Actemium's employees, the agreed deadlines were met to the day. Actemium performed the following services:
|
Technical highlights: | 68,000 m I&C cable 77 I&C cabinets and marshalling cabinets 640,000 m jumper wires 1,100 measuring devices |