Type of plant:

Pforzheim biomass CHP plant

Customer:

Metz Anlagentechnik GmbH

Project site:

Berlin

Project description:

Installation of central process control and electrical systems for the Pforzheim biomass CHP plant. 

Scope of services:
hardware engineering, programming, CAD/CAE documentation with system ecscad 5.5, fabrication, assembly, cold and hot commissioning, trial operation und operator training.

 

Technical highlights:

  • Siemens PCS7 V6.0 and MFL 6.1
  • Opt. electrical system bus Industrial Ethernet 100Mbit/s
  • 2 operator stations and 1 engineering station
  • central control 2 AS‘n S7-417-4H for water-steam system, boiler, flue gas scrubbing, air condensor
  • Redundant Profibus DP with ET200M
  • Boiler protection and EMERGENCY OFF control S7-300F
  • Connection of approx. 20 frequency inverters via redundant Profibus DP
  • In-situ measurement technique for water-steam system
  • Emission control system
  • ABB MNS low-voltage switchgear system with complete short-circuit and selectivity calculation
  • Gutor 80kVA UPS system
  • CEAG central battery system for safety lightingCEAG central battery system for safety lighting